10 checks · printable A4 · free
Thanks - your checklist is ready.
Download the PDF ↓Tired of chasing paper? Do this check digitally with Checkmate - free for 2 weeks.
What's on the checklist
Every sheet has space for: Site · Asset / ID · Date · Time · Checked by · Signature.
| # | Check | Pass | Fail |
|---|---|---|---|
| 1 | Extraction switched on and running before work starts | ||
| 2 | Airflow indicator / gauge showing within the normal range | ||
| 3 | Hoods and capture points positioned close to the source | ||
| 4 | Ducting: no holes, dents, loose joints or blockages | ||
| 5 | Flexible arms and hoses undamaged and stay in position | ||
| 6 | Filters and bins not overfull, no dust escaping | ||
| 7 | Fan sounding normal, no unusual vibration | ||
| 8 | No visible dust or fume escaping around the work | ||
| 9 | Thorough examination and test label in date (within 14 months) | ||
| 10 | Defects reported and logged |
Defects found and action taken: space to write any defects and the action taken.
These are general checklists. Always follow the manufacturer's instructions and your own risk assessment, and adapt the items to your equipment. They don't replace expert inspections required by law or guidance, such as LOLER thorough examinations or annual racking inspections.
Want to know more? Read our guide: PUWER Inspections Explained: What UK Law Requires for Work Equipment Checks.